Allows safe and secure lift handling points to be bonded into larger and heavy membranes.
Considered needed for membranes larger or heavier than 3 m2/ 20kg +.
Recommended strategically spaced 1 for every 1.0 m2 absolute minimum. Tested to 30 kg. Recommended load not greater than 7 kg.